Skip to content

Xtra long leader...

Featured Replies

  • Super User

Thought I might tie a +20' 8lb or 10lb fluoro leader to a couple of reels (spinning & casting) spooled with PE mainline to see if I liked the result.  Looking to maximize the fishing benefits of both line materials.  I'm certain this isn't a new idea... anybody gone down this road already that wants to share your opinion/results.

 

 

oe 

  • Super User

Tried it and don't like it - just me. Any time that comnecting knot gets inside the first guide, and especially onto the reel proper, it seems like the odds of your line catching and something bad happening goes up, enough that the possible benefits don't outweigh the negatives for me. I feel I get the best overall combination starting with about a 5-6 foot leader. I have no doubt many use longer leaders without issue, so it obviously becomes a personal decision with no right or wrong answer.

9 minutes ago, Team9nine said:

Tried it and don't like it - just me. Any time that comnecting knot gets inside the first guide, and especially onto the reel proper, it seems like the odds of your line catching and something bad happening goes up, enough that the possible benefits don't outweigh the negatives for me. I feel I get the best overall combination starting with about a 5-6 foot leader. I have no doubt many use longer leaders without issue, so it obviously becomes a personal decision with no right or wrong answer.

This.  Did it.  Reel grew many afro's.  Stopped doing it.

  • Author
  • Super User

I'm anticipating possible problems with casting reels as the connecting knot comes off the reel and may catch slightly on the line guide (?), what problems arose on spinning reels?

 

 

oe

  • Super User

I tried everything with finesse spinning using braid with FC leaders. Long leaders require  very low profile leader to braid knots like the FG. I am a line feeler and being very aware of the knot coming off the spool, going through the guides bothered me. Rerigging on the water was a pain trying to tie very difficult knots. I liked the long leader better then short leaders, the knots became the issue with braid to FC.

For me 1 knot beats 2 and gave up braid with leaders.

Tom

  • Super User

One theory for long leaders was to get the know on the spool and eliminate a weak sport when the fish is within the final 10 feet.  While there is merit in the theory, I have never had a break at the Braid/FC knot......and I don’t like the feel.  

  • Super User
13 minutes ago, OkobojiEagle said:

I'm anticipating possible problems with casting reels as the connecting knot comes off the reel and may catch slightly on the line guide (?), what problems arose on spinning reels?

 

 

oe

The same - line coming off catches line/leader knot. Spinning also more prone to twists or loops causing "bird's nest" because leader material doesn't handle line twist as well.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.